Hyperscale data center, Greater Toronto Area
Cross-referenced 1,000+ imported tray-cable connectors to CSA-certified equivalents, matched line-for-line, so the electrical contractor kept the colocation build on its inspection schedule.
Industries served
Certified connectors, glands and enclosures for hyperscale and colocation builds — matched line-for-line, delivered on schedule.
Ex Solutions supplies and cross-references certified tray-cable connectors, cable glands and enclosures for hyperscale and colocation data-center construction — matching imported or specified parts to CSA-certified equivalents and delivering them at the volume and pace a build demands.
The challenge
Data-center construction runs on schedule and certification. Contractors often arrive with a bill of materials built around imported or US-spec connectors that must be matched to CSA-certified equivalents — at volumes of hundreds or thousands of pieces — without slipping the inspection date on a colo build.
What we supply
Recent projects
Anonymized for confidentiality — real scope, real scale.
Cross-referenced 1,000+ imported tray-cable connectors to CSA-certified equivalents, matched line-for-line, so the electrical contractor kept the colocation build on its inspection schedule.
Data centers aren't a classic explosion hazard, but they are a certification and volume market — and that's squarely our lane. A hyperscale or colocation build arrives with a bill of materials built around imported or US-spec tray-cable connectors and glands, and every one has to be matched to a CSA-certified equivalent that will pass a Canadian inspection.
We take the specified list, cross-reference each line to a certified equivalent by hand, confirm factory lead times, and quote the whole package. For a build measured in thousands of connectors, getting that match right — and fast — is what keeps the electrical contractor on schedule.
Large connector counts ship matched and complete, so the line list is closed in a single order rather than chased part by part.
Common questions
Send us your line list, spec, or drawing. We’ll quote the certified equipment and cross-reference anything you can’t find.